Instruction Of Tiles
- Jan 11, 2018 -
  1. Before paving, put the tiles into clear water for 20mins, then filter out water and start to pave.

  2. Pave the tiles by the united pattern direction.

  3. Use gap paving,which is a popular operation method in international decoration construction.The gapshould be of 1-3mm(except for special decorative effect)and cleaned timely. Mounting should be donenearly 4 hours after paving.

  4. Apply low number cement onto the smoothly plastered surface.It is suggested that the thickness of cementshould be no more than 5mm.

  5. Keep the tile surface clean during paving and after completion. Clean innediately in case of any dirtaccording to the following ways;